撬装化设计在长输天然气管道站场的应用
Skid design in the application of natural gas station
浏览(8914) 下载(3)
- DOI:
- 作者:
- 田奕丰
- 作者单位:
- 中国石油管道局工程有限公司
- 关键词:
- 天然气站场;橇装;建设工期;设备安装
- 摘要:
- 天然气开采和利用规模的不断扩大,带动了天然气站场的建设。早一天建成站场,早一天占领市场,早一天实现供气,就能早一天获得收益。而常规的站场设备安装前置条件较多,设备资料、设计图纸、建设方意见等环节紧密连接,一环滞后都将影响整个工期和工程建设质量。且涉及设备材料的供应商较多,沟通协调工作量大,施工周期长。以某天然气长输管道分输站为例,说明橇装化设计能同时满足占地面积小、设备重复利用率高、建设工期短、项目管理简单等特点,为橇装化设计在天然气长输管道站场的应用提供支持。
The expansion of the scale of Natural gas exploitation and utilization,Increase the construction of the gas station.Built station earlier, occupy the market as early as one day, a day before implement gas supply, can a day earlier to get benefits.While precondition of traditional installation of equipment is more, equipment information, design drawings, project owner opinion and so on, close connection, any link will influence the whole construction period and construction quality.And a number of equipment material suppliers involved, the work load of communication and coordination is big, long construction period.To a distribution station gas transmission pipeline as an example, That skid design can satisfy both cover an area of an area small, high equipment utilization rate of repeat, short construction period, simple project management and so on, for the skid design in the yard of the gas transmission pipeline application support.